SMRP metric 3.3 · Revised in the 7th edition
Scheduled downtime (SMRP Metric 3.3)
The short-form equation is Tsch = Σ scheduled downtime. Every symbol is defined in the variable key below.
Downtime that was planned onto the weekly schedule (PMs, scheduled repairs, scheduled breaks).
Tsch = Σ scheduled downtime
Scheduled downtime (%) = Tsch / Ta × 100. Count work that is on the finalized weekly schedule.
Ex. 30 h PM + 20 h scheduled breaks = 50 h → 50 / 720 = 6.9%.
Edition note. This metric is listed as revised in the 7th edition of SMRP Best Practices. The formula on this page is the 7th-edition form. The exam may still use earlier wording, so if a question quotes a formula, use the formula in the question. Unconfirmed 6th-edition equations are not shown.
This page is study material for the closed-book CMRP exam. It is not official SMRP text. Learn the short-form equation and the variable key well enough to write them from memory.