Five original questions from our free CMRP diagnostic, with answers and explanations. They are not official exam questions and do not reuse official exam content.
One item from each pillar is included so you can see the tone of the bank — definitions, a calculation, and a “best answer” scenario. The 7th-edition cycle-time note appears in the Pillar 2 explanation. For the rest of the diagnostic, take the free 30-question CMRP diagnostic. Full-length practice is in the $99 practice-exam pack.
Pillar 1 · Business and Management · Sample 1
How does this course distinguish maintenance cost from the cost of unreliability?
A. Maintenance cost is the cost of doing the maintenance work. The cost of unreliability is the business impact of failures, such as lost production, scrap, and overtime.
B. The two phrases are synonyms for the same work-order total.
C. The cost of unreliability is only the storeroom’s inventory carrying cost.
D. Maintenance cost already includes lost production and scrap; the cost of unreliability is only the training and development budget.
Answer: A
Maintenance cost is what you spend to do the work. The cost of unreliability is the business loss when systems fail. The main distractor treats them as the same number, which hides the reason to invest in reliability.
Pillar 2 · Manufacturing Process Reliability · Sample 2
A plant measures cycle time rather than an hourly rate. Which performance formula is correct?
A. P = t_actual / t_best, the inverted ratio of actual over best cycle time.
B. P = t_actual - t_best, in minutes, used as the efficiency fraction.
C. P = t_best / t_actual, the best (shortest) cycle time over the actual cycle time.
D. P = (t_actual + t_best) / 2.
Answer: C
When the data are cycle times, P is best over actual, so a longer actual cycle lowers P. The main distractor inverts the ratio (actual / best), which is a known wording trap and would push P above 1 when the line is slower than standard. Edition note: the 2.1.1 formula box prints actual ÷ best for cycle time; Guideline 2.0 and the 100% cap use best ÷ actual, which this course follows.
Pillar 3 · Equipment Reliability · Sample 3
Unscheduled downtime is 28 hours in a 700-hour available-time period. Using BP 3.4, what is unscheduled downtime percent?
A. 25.0%
B. 28%
C. 3.5%
D. 4.0%
Answer: D
28 / 700 times 100 = 4.0%. The main distractor (25.0%) inverts the ratio, dividing total available time by unscheduled downtime (700 / 28 = 25). Equation: unscheduled downtime percent = (T_un / T_a) × 100, where T_un is unscheduled downtime and T_a is total available time.
Pillar 4 · Organization and Leadership · Sample 4
When is a more decentralized crew structure often a good fit?
A. When area knowledge, fast response, and a tight bond with a single operating unit matter more than pooling every craft in one central shop.
B. Always, even when the site needs scarce specialists to be shared.
C. When scarce specialists must be shared across many units, still give every area a full copy of every craft.
D. When the site’s main need is one shared pool of scarce specialists and consistent methods, rather than a tight bond with a single unit.
Answer: A
Area-based crews can be right when unit knowledge and response time matter. The main distractor says this is always right, even when scarce specialists need to be shared — a case that often argues for a hybrid or more central pool.
Pillar 5 · Work Management · Sample 5
Cycle counting is used in a storeroom to do what?
A. Count a scheduled portion of the stock on a rotating basis so record accuracy can be maintained without a single annual shutdown of the aisle.
B. Replace the perpetual inventory with one wall-to-wall physical count each year, and skip counts in between.
C. Use cycle counts in place of recording receipts and issues, so the count becomes the only inventory transaction.
D. Cycle-count only low-value C items and skip A items, because high-value parts are assumed to be accurate.
Answer: A
Cycle counting is a rotating accuracy program, not a once-a-year wall-to-wall inventory. The main distractor substitutes an annual physical for a scheduled rotating count.