CMRT Domain II

CMRT Domain II: Preventive and Predictive Maintenance

Domain II is planned care of the asset: doing PM and PdM to the plan, collecting condition data correctly, lubricating and aligning to spec, and leaving safety devices able to work.

Preventive and predictive maintenance is the second CMRT performance domain. It is a technician-level domain. The exam is more likely to ask how you would take an oil sample, set up a vibration point, or respond to a bypassed interlock than which corporate program to buy. Official domain weightings are not published.

Doing the route to the plan

PM and PdM work is done to the job plan, on interval, so the asset can run longer between failures. Skipping a step to “get around the machine,” or marking the work complete when a task was not done, is how hidden failures sit until they matter. If you find a defect on the route, it should be recorded so corrective work can be planned.

Condition-monitoring data

Vibration, oil analysis, thermography, and ultrasonic testing only help if the data are comparable over time. Measurement points are marked or fitted with mounts so the same location and axis are used on every route. Oil samples are drawn from a live, representative point — not from a dead-leg drain because it was easy to reach — and at a consistent operating condition.

When a reading is unusual, the first job is to confirm it and to compare it with the baseline and with similar assets, not to jump to a major repair on a single unexplained number.

Lubrication, alignment, and safety devices

Lubrication is done to the schedule and the equipment specification: the right lubricant, the right amount, and a clean method. A bearing that runs much hotter right after a regrease is a sign that something in that step went wrong, not a reason to ignore the temperature and move on.

Alignment checks belong in this domain as well: soft foot, pipe strain, and coupling gap are corrected before a final laser or dial reading is trusted.

Safety devices found bypassed — a taped interlock, a jumpered switch — are restored, function-tested, and reported. A production request is not a reason to leave a guard defeated. A zip tie is still a bypass, and removing tape without a test does not prove the switch works.

Frequently asked questions

Is this the same as a CMRP pillar?

No. CMRT is organized in four performance domains, not the five CMRP pillars. This page covers the technician-level work in this domain. Official domain weightings are not published.

Where can I practice questions in this domain?

A short set of worked samples is on the CMRT sample questions page. Full-length practice is in the $79 CMRT practice-exam pack. Those items are original and are not official exam questions.

Practice at the official exam length

Three 110-question CMRT practice exams ($79), with answer-key PDFs and domain scoring. Set a 2.5-hour timer of your own; Payhip quizzes do not have a built-in countdown.